Transport for London (TfL) and Siemens Mobility have unveiled the detailed design of the new generation Tube trains for the Piccadilly line, which will soon be in production to replace the existing 1970s fleet.
In the second quarter of 2020, InfraLeuna awarded the Rhomberg Sersa Vossloh cooperative the contract to digitalize the rail infrastructure at its chemical complex in order to optimize its long-term, track system management.
The German distributor Acceed and the globally operating manufacturer Adlink are connected with a partnership which has already existed for several decades.
The THN 20WIR series is a family of ruggedized 20 Watt DC/DC converters for highest reliability in harsh environments, expanding our existing railway range in the 1” x 1” package up to 20 Watt. The THN 20WIR has a wide 4:1 input range and increased resistance against electromagnetic interference, shock/vibration and thermal shock and come in a compact six-side shielded 1” x 1” metal package.
Hitachi Rail has successfully tested its first battery-powered tram in Florence – an important milestone towards expanding the firm’s offer to market the vehicles across the world.
Leading global manufacturer, CMP Products, has rewarded 24 temporary workers for their contribution and loyalty with the offer of permanent employment.