railway-international.com
19
'22
Written on Modified on
ALSTOM News
Alstom takes another step towards Autonomous Train Operation in the Netherlands
Alstom has tested Elta Systems Obstacle Detection System (ODS) with infrastructure manager ProRail and rail freight operator Lineas in the Netherlands. Alstom, global leader in smart mobility, and its partner Elta Systems and its smart mobility spin-off NIART have successfully performed tests of the Obstacle Detection System (ODS) in Oosterhout, near the city of Breda in The Netherlands.
Credit photo : LineasThese tests, which were conducted with Dutch infrastructure manager ProRail and rail freight operator Lineas have demonstrated that the Obstacle Detection System (ODS) installed on-board the locomotive is able to detect obstacles up to 1,000 metres distance in all-weather and visibility (day and night) conditions. It can be operated as a Driver-Assistance-System as well as a fully automated system in conjunction with Alstom’s AutoPilot component. These tests were performed in the context of the ongoing Automatic Train Operation (ATO) tests on shunting trains in GoA level 4 of automation.
“Thanks to the ODS & NIART’s expertise, the locomotive is able to detect both large obstacles such as a car and smaller ones such as a rabbit or human being, both during the day and at night”
Abel Poelaert
Customer Director Alstom Benelux
NIART’s ODS is a perception system based on an innovative High Resolution Digital Radar fused with Multi-Spectral Electro-Optics backboned by powerful Classical and Machine Learning algorithms to detect and classify obstacles in the train route at 1000 metres distance, in all weather and visibility conditions . The system is a complete self-contained on-board solution able to provide the locomotive driver early alert and actionable insights, and ensure safety and reliability of the route, especially in harsh weather conditions.
The game changer is the radar, that scans the path ahead as fast as 200 times a second and utilizes high-resolution imaging technics to analyse the scene and detect obstacles further than one kilometre away, even when the visibility for driver and optic-based systems is degraded. Elta Systems’ experience in imaging techniques used in Ground and Space-Borne systems is ported to the automotive world, to solve one of the major challenges of railway automation - reliable operation in all weather conditions.
Paving the way for smart and green mobility
The next phase of the pilot project in The Netherlands, which will be performed in the coming weeks, will be to test the ODS in combination with Automatic Train Operation (ATO). The final goal is to have a shunting locomotive which will drive completely on its own, to fully integrate ODS with ATO systems and therefore, to enable GOA3-4 operation for future autonomous trains. These next test phases will be carried out before the end of the summer.
These tests performed with NIART, ProRail and Lineas are fully in line with Alstom’s strategy to evolve towards smart and green mobility. Alstom has demonstrated the advantages of ATO especially on metro systems around the world. Experience shows that automation leads to capacity increase, cost reduction, energy savings and flexibility of operations. Automation in rail is a way for operators to increase the capacity on their networks without making expensive changes to the infrastructure.
www.alstom.com