Join the 155,000+ IMP followers

railway-international.com
Crecg News

Construction of the Last T-beam Bridge on Boten–Vientiane Railway Started

The first T-shaped concrete beam of the last and the longest bridge.

Construction of the Last T-beam Bridge on Boten–Vientiane Railway Started

The first T-shaped concrete beam of the last and the longest bridge on Boten-Vientiane Railway was erected on February 11. The bridge stretches 7,531.06 meters in length and is located in southern Vientiane, the capital of Laos. (Photo: Zhu Lei)

www.crecg.com

  Ask For More Information…

LinkedIn
Pinterest

Join the 155,000+ IMP followers