Join the 155,000+ IMP followers

railway-international.com

voestalpine Railway Systems streamlines slab track installation with Cast Fix & Fastening System 300

Pre-assembled fixing components and adjustable rail fastening improve installation accuracy, assembly efficiency and track geometry control.

  www.voestalpine.com
voestalpine Railway Systems streamlines slab track installation with Cast Fix & Fastening System 300

In an effort to optimize modern slab track construction, voestalpine Railway Systems has introduced the Cast Fix installation aid and the Fastening System 300. These engineered solutions provide structural reinforcement and precise track alignment for high-speed rail networks, conventional transit lines, and complex turnout areas.

Mechanics of Top-Down Track Assembly
Top-down construction of slab tracks requires absolute positional accuracy before the concrete matrix is poured. The Cast Fix system functions as an integrated installation unit that secures the base plate, elastic support, and leveling elements simultaneously. By locking these components together, the system ensures that the elastic support plates remain fixed during the pouring process. This mechanism prevents the plates from sagging or sustaining contamination from fresh concrete, a critical requirement when deploying larger support plates in turnout configurations.


voestalpine Railway Systems streamlines slab track installation with Cast Fix & Fastening System 300

Mitigation of Alignment Deviations
Securing the fixing points prior to concrete hardening directly impacts the final track geometry. Consolidating the mounting components eliminates the requirement for external auxiliary frames to hold support points in place. This reduction in temporary construction structures minimizes the risk of physical damage to the elastic plates on the construction site and significantly decreases the need for post-pour track and height geometry corrections.


voestalpine Railway Systems streamlines slab track installation with Cast Fix & Fastening System 300

Elastic Fastening and Rail Stability
Engineered for both high-speed and conventional rail operations, the Fastening System 300 provides adaptability for track gauge and height adjustments, allowing the infrastructure to meet specific geometric tolerances. The elastic mounting facilitates controlled force transmission between the steel rail and the concrete track bed, ensuring dynamic stability under load.


voestalpine Railway Systems streamlines slab track installation with Cast Fix & Fastening System 300

A core mechanical component of this setup is the SKL15 tension clamp. Positioned centrally over the rail foot, the clamp distributes downward forces evenly across the rail base. This symmetrical force distribution mitigates the risk of clamp deformation, prevents longitudinal rail rotation, and accommodates the pre-assembly of individual components prior to final track installation. Pre-assembling these units reduces overall onsite assembly duration and enhances installation throughput.

Additional Context:
This section details technical specifications and competitive benchmarking not included in the original product announcement

Within the rail fastening sector, top-down slab track systems are evaluated based on their ability to maintain precise gauge tolerances during concrete curing. The Fastening System 300 and its SKL15 tension clamp operate in the same technical category as the Vossloh System 300 series, a recognized benchmark in high-speed slab track fastening. Both systems utilize highly elastic intermediate pads and specific tension clamps to achieve the necessary vertical deflection and continuous rail restraint required for trains operating at speeds exceeding 250 kilometers per hour. The distinct integration of a unified pre-pour assembly unit like Cast Fix offers a measurable reduction in the auxiliary steelwork usually required to suspend track panels over the concrete bed during the top-down construction methodology.

Edited by Natania Lyngdoh, Induportals editor, assisted by AI.

www.voestalpine.com

  Ask For More Information…

LinkedIn
Pinterest

Join the 155,000+ IMP followers